No | Pekerjaan | Klien | Rincian Pekerjaan |
---|---|---|---|
1 | Supply & Installations Palm oil Mill 30 tons TBS/Hour Solok - Sumbar | PT. Sumber Andalan Mandiri Solok - Sumbar 2012 | Supply & Install MSB panel Synchrone Supply & Install Factory lighting Supply & Install Cable Power Genset, Supply & Install Cablel Turbine Supply & Install earthing sistem Cable E. Motor Testing & Commisioning |
2 | Panel Bunch Press Project Palm Oil Mill Kedukul | PT. Sumber Andalan Mandiri Kalimantan Selatan 2012 | Supply Panel Empty Bunch Press |
3 | Supply & Installations Electrical Palm Oil Mill PT. Sejati palma sejahterah | CV. Sidohita Elektrik Jambi 2012 | Supply & Install Panel Synchrone Turbine, Genset Supply & Supply & Install Factory lighting Supply & Install Compound Lighting Supply & Install Cable Power Genset Supply & Install Cablel Turbine Supply & Install earthing sistem Cable E. Motor Testing & Commisioning |
4 | Supply & Installations Electrical Palm Oil Mill 45 Tons TBS/Hour PT. Sejati palma sejahterah | PT. Indoduta Cipta Lestari Bengkulu Selatan 2012 | Install Panel Synchrone Turbine, Genset Install Factory lighting Install Compound Lighting Install Cable Power Genset Install Cablel Turbine Install earthing sistem Cable E. Motor Testing & Commisioning |
5 | Supply & Installations Panel PUTR | CV. Sidohita Elektrik Jambi 2012 | Supply Panel Distribution Kapacity 6300 A c/ w ACB And out Going Feeder |
6 | Supply & Installation Electrical Crumb Rubber Mill PT.Perkebunan Nusantara XIII | PT. Jiwa Bangun Kalimantan Selatan 2012 | Supply & Install Panel Synchrone, Genset Supply & Install Factory lighting Supply & Install Compound Lighting Supply & Install Cable Power Genset Supply & Install earthing system Supply & Install lightning Protection Cable E. Motor Testing & Commisioning |
7 | Instalations Lightning Protection PT. Flora Wahana Tirta | PT. Flora Wahana Tirta Pekan Baru 2012 | Instalation lightning Protection Grounding Rod Cable Protection |
8 | Instalations Lightning Protection PT. Eka Jaya Multi Perkasa | PT. Eka Jaya Multi Perkasa Lahat 2012 | Instalation lightning Protection Grounding Rod Cable Protection |
9 | Installations Lightning Protection PT. Batang Hari Sawit Sejahtera | PT. Batang Hari Sawit Sejahtera Jambi 2012 | Instalation lightning Protection Grounding Rod Cable Protection |
10 | Installations Inverter PT. Bukit Barisan Indah Prima | PT. Bukit Barisan Indah Prima Jambi 2012 | Installation lightning Protection Grounding Rod Cable Protection |
11 | Installations Inverter Palm Oil Mill PT. Perkebunan Nusantara II | PT. Bina Multi Instrumindo Sawit Hulu 2012 | Supply Panel Inverter Install Panel Inverter Install Factory lighting Install Cable Power P. Inverter Install earthing sistem Cable E. Motor Testing Comisioning |
12 | Installations Inverter Palm Oil Mill PT. Perkebunan Nusantara II | PT. Bina Multi Instrumindo Pagar Merbau 2012 | Supply Panel Inverter Install Panel Inverter Install Factory lighting Install Cable Power P. Inverter Install earthing sistem Cable E. Motor Testing Comisioning |
13 | Installations Inverter Palm Oil Mill PT. Perkebunan Nusantara II | PT. Bina Multi Instrumindo Kuala Sawit 2012 | Supply Panel Inverter Install Panel Inverter Install Factory lighting Install Cable Power P. Inverter Install earthing sistem Cable E. Motor Testing Comisioning |
14 | Installations Panel KCP 100 TON | PT. Asia Agri Pekan Baru 2013 | Supply &Install MSB Panel Install Factory lighting Install Cable Power Genset Install Cablel Turbine Install earthing sistem Cable E. Motor Wiring |
15 | Installations Panel AMF / ATS | PT. Lince Romauli Raya (kesayangan group) Banda Aceh 2013 | Supply & Install AMF Panel Commisioning Test |
16 | Supply Cabel Leader & Accesories Palm Oil Mill Parsambilan | PT. Sabar Ganda Sulawesi Tenggara 2013 | Supply Cabel Leader HotDip Galvanish And Accesories |
17 | Installations Turbine 1400 KW Palm Oil Mill PT. Ekajaya Multi Perkasa | PT. Ekajaya Multi Perkasa Lahat 2013 | Supply & Install ACB 3200A Install Cablel Turbine Install earthing sistem Wiring & Modification Synchrone Install Busbar Test Commisioning |
18 | Installation Synchrone Turbine 1200 KW Palm Oil Mill PT. Anugerah Multi Sawita | PT. Anugerah Multi Sawita Sei Piring 2013 | Supply & Install ACB 3200A Install Cablel Turbine Install earthing sistem Wiring & Modification Synchrone Install Busbar Test Commisioning |
19 | Supply and Installations Electrical Palm Oil Mill 45-60 Tons Tbs/Jam PT. Asian Agri Tg. Paud | PT. Surya Pratama Kreasindo Pekan Baru 2013 | Install Panel Synchrone Turbine, Genset Install Factory lighting Install Compound Lighting Install Cable Power Genset Install Cablel Turbine Install earthing sistem Cable E. Motor Testing & Commisioning |
20 | Installation Turbine 1000 KW Palm Oil Mill PT. Tamaco Graha Krida | PT.Agrindo Kalimantan Lestari Sulawesi 2013 | Supply & Install ACB 3200A Install Cablel Turbine Install earthing sistem Wiring & Modification Synchrone Install Busbar Test Commisioning |
21 | Supply and Installations Electrical Palm Oil Mill 45 - 60 Tons Tbs/Jam PT. Sungai Bahar Pasifik Utama | CV .Sidohita Elektrik Jambi 2013 | Install Panel Synchrone Turbine, Genset Install Factory lighting Install Compound Lighting Install Cable Power Genset Install Cablel Turbine Install earthing sistem Cable E. Motor Testing & Commisioning |
22 | Supply and Installations Electrical Palm Oil Mill 45 Tons Tbs/Jam PT. Inti Guna Nabati | CV .Sidohita Elektrik Jambi 2013 | Install Panel Synchrone Turbine, Genset Install Factory lighting Install Compound Lighting Install Cable Power Genset Install Cablel Turbine Cable E. Motor Testing & Commisioning |
23 | Electrical and Instrument Installation Thermax HP Boiler | PT. Pacific Palmindo Industri Medan 2013 | Install Instrument PLC Install earthing sistem Install Factory lighting Cable E. Motor Testing & Commisioning |
24 | Supply and Installations Electrical | PT. CJ Feed Medan Medan 2013 | Installation Capasitor Bank Upgrade PLN 2000 A Modifikasi System Control Panel 2000 A |
25 | Supply and Installations Electrical Palm Oil Mill 45 Tons Tbs/Jam PT. Lonsum | PT. Sumber Andalan Mandiri 2013 | Supply Panel Inverter Install Factory lighting Install Compound Lighting Install Cable Power Cable E. Motor Testing & Commisioning |
26 | Instalation Turbine 2300 KW Palm Oil Mill Sosa Menanti | PT. Permata Hijau Sawit Padang Lawas 2013 | Supply & Install ACB 3200A Install Cablel Turbine Install earthing sistem Wiring & Modification Synchrone Install Busbar Test Commisioning |
27 | Calibration Relay Protection, Ampere Meter, Panel MCB PT. Agrolestari Mandiri | PT. Duta Marga Lestarindo Kalimantan Barat 2013 | Repair Testing & Commisioning |
28 | Supply and Instalations Electrical Palm Oil Mill 30 Tons Tbs/Jam PT. Gemilang Artha Prima Lestari | PT. Citra Indah Karya Pekanbaru 2013 | Install Panel Synchrone Turbine, Genset, Mcc Install Factory lighting Install Compound Lighting Install Cable Power Genset Install Cablel Turbine |
29 | Supply and Instalations Electrical Palm Oil Mill 45 Tons Tbs/Jam PT. Kebun Mandiri Sejahtera | PT. Eracipta Binakarya Kalimantan Timur 2013 | Supply Panel PMKS 45 Tons MSB, MCC, Lighting Testing & Commisioning |
30 | Supply and Installations Electrical MCC Panel Station KCP 400 Tons PT. Anugerah Multi Sawita | PT. Anugerah Multi Sawita Sei Piring - Sumatera Utara 2014 | Supply Panel KCP 400 Tons MCC, KCP Testing & Commisioning |
31 | Supply and Instalations Electrical Palm Oil Mill 30 Tons Tbs/Jam PT. Cipta Agro Sejati | PT. Cipta Agro Sejati Bagan Batu - Riau 2014 | Install Panel Synchrone Turbine, Genset Install Factory lighting Install Compound Lighting Install Cable Power Genset Install Cablel Turbine Install earthing sistem Cable E. Motor Testing & Commisioning |
32 | Instalation Turbine 1600 KVA Palm Oil Mill PT. Sapta Karya Damai | PT. Sapta Karya Damai Kalimantan Timur 2014 | Supply & Install ACB 3200A Install Cablel Turbine Install earthing sistem Wiring & Modification Synchrone Install Busbar Test Commisioning |
33 | Modifikasi System Power Plant PT. Pelita Agung Agrindustri | Permata Hijau Group Simpang Bangko - Duri 2014 | Supply & Install ACB 6300A Install Cablel Turbine Install earthing sistem Wiring & Modification Synchrone Install Busbar Test Commisioning |
34 | Terminasi Transformer 4000 KVA, Booster Pump PT. Sari Dumai Sejati | PT. Sari Dumai Sejati Dumai - Riau 2014 | Install Panel & Modification MSB Install Factory lighting Install Cablel From Power Plant Install earthing sistem Testing & Commisioning |
35 | Instalation BIO GAS Cap. 1000 KW | PT. Asian Agri Group Gunung Melayu 2014 | Install Panel MSB Install Factory lighting Install Cable Power From MSB Instal Earting System Testing & Commisioning |
36 | Instalation BIO GAS Cap. 1000 KW | PT. Asian Agri Group Negeri Lama 2014 | Install Panel MSB Install Factory lighting Install Cable Power From MSB Instal Earting System Testing & Commisioning |
37 | Instalation BIO GAS Cap. 1000 KW | PT. Asian Agri Group Buatan Satu 2014 | Install Panel MSB Install Factory lighting Install Cable Power From MSB Instal Earting System Testing & Commisioning |
38 | Instalation BIO GAS Cap. 1000 KW | PT. Asian Agri Group Ukui Satu 2014 | Install Panel MSB Install Factory lighting Install Cable Power From MSB Instal Earting System Testing & Commisioning |
39 | Instalation BIO GAS Cap. 1000 KW | PT. Asian Agri Group Taman Raja 2014 | Install Panel MSB Install Factory lighting Install Compound Lighting Install Cable Power From MSB Instal Earting System Testing & Commisioning |
40 | Instalation Kernel Plant KCP 100 - 150 Ton | PT. Asian Agri Group Gunung Melayu 2014 | Install Panel MCC KCP Install Factory lighting Install Rack Kabel Install Cable Power Instal Cabel Electro Motor Testing & Commisioning |
41 | Instalation Kernel Plant KCP 100 - 150 Ton | PT. Asian Agri Group Negeri Lama 2014 | Install Panel MCC KCP Install Factory lighting Install Rack Kabel Install Cable Power Instal Cabel Electro Motor Testing & Commisioning |
42 | Instalation Kernel Plant KCP 100 - 150 Ton | PT. Asian Agri Group Buatan Satu 2014 | Install Panel MCC KCP Install Factory lighting Install Rack Kabel Install Cable Power Instal Cabel Electro Motor Testing & Commisioning |
43 | Instalation Kernel Plant KCP 100 - 150 Ton | PT. Asian Agri Group Taman Raja 2014 | Install Panel MCC KCP Install Factory lighting Install Rack Kabel Install Cable Power Instal Cabel Electro Motor Testing & Commisioning |
44 | Installation Kernel Plant KCP 100 - 150 Ton | PT. Asian Agri Group Tanjung Pauh 2014 | Install Panel MCC KCP Install Factory lighting Install Rack Kabel Install Cable Power Instal Cabel Electro Motor Testing & Commisioning |
45 | Supply and Install Over Head Jaringan PT. Pelita Agung Agrindustri | PT. Permata Hijau Group Simpang Bako 2014 | Supply Install Over Head Supply Install Panel Stater 90 KW Instal Cabel Electro Motor Testing & Commisioning |
46 | Supply Installation Electrical Palm Oil Mill Cap 45 Ton PT. Sriwijaya Palm Oil Indonesia | PT. Sriwijaya Palm Oil Indonesia Palembang 2014 | Install Panel MSB, MCC, Lighting Install Factory Lighting Install kabel turbine dan electro motor Install kabel Tray Instal Earting System Testing & Commisioning |
47 | Supply & Installation Electrical Palm Oil Mill Cap 20 Ton PT. Besteel Lestarindo | PT. Besteel Lestarindo Dolok, Deli Serdang 2014 | Install Panel MSB, MCC, Lighting Install Factory Lighting Install kabel turbine dan elektro motor Install kabel Tray Instal Earting System Testing & Commisioning |
48 | Supply & Installation Electrical Palm Oil Mill Cap 45 - 90 Ton Tbs/hour PT. Agri Eastborneo Kencana | PT. Pancakarsa Bangun Reksa Medan 2014 | Install Panel Synchrone Turbine, Genset Install Factory lighting Install Compound Lighting Install Cable Power Genset Install Cablel Turbine Install earthing sistem Cable E. Motor Testing & Commisioning |
49 | Supply Panel Transfer Carriage 7,5 KW/10 HP | PT. Pancakarsa Bangun Reksa Medan 2014 | Supply Panel Transfer Carriage 7,5 KW Testing & Commisioning |
50 | Supply Panel Oil Despacth | PT. Pancakarsa Bangun Reksa Medan 2014 | Supply Panel Oil Despatch Testing & Commisioning |
51 | Supply & Instalationl Electrical Palm Oil Mill Distribusi dan Instalasi RO | PT. Nagamas Palm Oil Lestari Dumai 2015 | Install Panel Synchrone Turbine, Genset Install Factory lighting Install Compound Lighting Install Cable Power Genset Install Cablel Turbine Install earthing sistem Cable E. Motor Testing & Commisioning |
52 | Supply Panel AMF/ ATS | CV. Tri Karya Sentosa Medan 2015 | Supply & Install AMF Panel Commisioning Test |
53 | Supply & Installation Electrical Palm Oil Mill 20 Ton Tbs/hour Extension 45 Tbs/hour | PT. Candi Artha Kalimantan Selatan - Banjarmasin 2015 | Supply Panel Inverter Install Factory lighting Install Compound Lighting Install Cable Power Cable E. Motor Testing & Commisioning |
54 | Supply Panel Bunch Press | CITRA KOPERASINDO TANI Jambi 2015 | Supply Panel Empty Bunch Press |
55 | Instalations Panel KCP 100 TON | CITRA KOPERASINDO TANI Jambi 2015 | Supply &Install MSB Panel Install Factory lighting Install Cable Power Genset Install Cablel Turbine Install earthing sistem Cable E. Motor Testing & Commisioning |
56 | Supply & Installation Electrical Palm Oil Mill Cap 45 Tons Tbs/jam PT. Joma Cinindo | PT. BUNGO SUKO MENANTI JAMBI 2015 | Install Panel MSB, MCC, Lighting Install Factory Lighting Install kabel turbine dan elektro motor Install kabel Tray Instal Earting System Supply Panel Empty Bunch Press Testing & Commisioning |
57 | Supply & Installation Electrical Palm Oil Mill Cap 60 Tons Tbs/Jam PT. Tanjung Harapan Mandiri | PT. Pancakarsa Bangun Reksa Medan 2015 | Install Panel Synchrone Turbine, Genset Install Factory lighting Install Compound Lighting Install Cable Power Genset Install Cablel Turbine Install earthing sistem Cable E. Motor Testing & Commisioning |
58 | Supply Electrical Panel Extension 60 Tons Tbs/ Jam CV. Sidohita Elektrik | CV .Sidohita Elektrik Jambi 2015 | Install Panel Synchrone Turbine, Genset Install Factory lighting Install Compound Lighting Install Cable Power Genset Install Cablel Turbine Cable E. Motor Testing & Commisioning |
59 | Supply & Instalation Electrical Palm Oil Mill Cap 30 Ton Tbs/Jam PT. Khatulistiwa Sinergy Omnidiya | PT. Andhika Pratama Jaya Abadi Medan 2015 | Install Panel MSB, MCC, Lighting Install Factory Lighting Install kabel turbine dan elektro motor Install kabel Tray Instal Earting System Cable E. Motor Testing & Commisioning |
60 | Supply Electrical Panel Extension Palm Oil Mill Cap 60 Ton Tbs/Jam CV. Mutiara Alam Lestari | CV. Mutiara Alam Lestari Bangka Belitung 2015 | Install Panel Synchrone Turbine, Genset Install Factory lighting Install Compound Lighting Install Cable Power Genset Install Cablel Turbine Cable E. Motor Testing & Commisioning |
61 | Supply & Instalation Electrical Palm Oil Mill Cap 60 Ton Tbs/Jam PT. Sentosa Bumi Wijaya | PT. Sentosa Bumi Wijaya Kalimantan Barat 2015 | Install Panel Synchrone Turbine, Genset Install Factory lighting Install Compound Lighting Install Cable Power Genset Install Cablel Turbine Cable E. Motor Testing & Commisioning |
62 | Supply Electrical Panel Extension Palm Oil Mill Cap 45 EXT 120 Ton Tbs/Jam PT. Selatan Agro Makmur Lestari | PT. Selatan Agro Makmur Lestari Palembang 2015 | Install Panel MSB, MCC, Lighting Install Factory Lighting Install kabel turbine dan elektro motor Install kabel Tray Instal Earting System Cable E. Motor Testing & Commisioning |
63 | Supply Electrical Panel Extension Palm Oil Mill Cap 45 EXT 120 Ton Tbs/Jam PT. Cipta Lestari Sawit | PT. Cipta Lestari Sawit Palembang 2015 | Install Panel MSB, MCC, Lighting Install Factory Lighting Install kabel turbine dan elektro motor Install kabel Tray Instal Earting System Cable E. Motor Testing & Commisioning |
64 | Supply & Instalation Electrical Palm Oil Mill Cap 45 Ton Tbs/Jam PT. Borneo Ketapang Indah | PT. Eracipta Binakarya Kalimantan Timur 2016 | Supply Panel PMKS 45 Tons MSB, MCC, Lighting Testing & Commisioning |
65 | Supply Panel Lube Oil Tank Powering PHS PT. Aes Agriverde Indonesia | PT. Aes Agriverde Indonesia Jakarta 2016 | Install Panel Lube Oil Tank |
66 | Supply & Instalation Electrical Palm Oil Mill Cap 30 Ton Tbs/Jam PT. Sawit Mas Paranggean | PT. Wijaya Karya Mandiri Teknik Kalimantan Tengah 2016 | Install Panel MSB, MCC, Lighting Install Factory Lighting Install kabel turbine dan elektro motor Install kabel Tray Instal Earting System Testing & Commisioning |
67 | Supply & Instalation Electrical Palm Oil Mill Cap 45 Ton Tbs/Jam PT. Sawit Mas Paranggean | PT. Duta Mentari Raya Teluk Kuantan 2016 | Install Panel MSB, MCC, Lighting Install Factory Lighting Install kabel turbine dan elektro motor Install kabel Tray Instal Earting System Cable E. Motor Testing & Commisioning |
68 | Supply Panel MSB PT. Graha Meruya | Hotel Maqna Residence Jakarta 2016 | Install Panel MSB Testing & Commisioning |
69 | Supply Panel KCP Plant PT. Sari Dumai Sejati | PT. Sari Dumai Sejati Dumai 2016 | Install Panel KCP Install Factory Lighting Install Cable Power Genset Install earthing system Cable E. Motor Testing & Commisioning |
70 | Supply & Instalation Electrical Palm Oil Mill Cap 30 Ton Tbs/Jam PT. Bumi Daya Agrotamas | PT. Wijaya Karya Mandiri Teknik Subussalam - Aceh 2016 | Install Panel MSB, MCC, Lighting Install Factory Lighting Install kabel turbine dan elektro motor Install kabel Tray Instal Earting System MSB, MCC, Lighting Testing & Commisioning |
71 | Supply & Instalation Electrical Palm Oil Mill Cap 45 Ton Tbs/Jam PT. Pratama Unggul Sejahtera | PT. Pratama Unggul Sejahtera Belitung 2016 | Install Panel MSB, MCC, Lighting Install Factory Lighting Install kabel turbine dan elektro motor Install kabel Tray Instal Earting System Cable E. Motor Testing & Commisioning |
72 | Supply Panel Cubicle PT. Danda Mandiri Pratama | PT. Danda Mandiri Pratama Medan 2016 | Install Panel Cubicle Testing & Commisioning |
73 | Supply Panel MCC Boiler Water Treatment Plant PT. Sinarmas Agro Resources Technology -Tbk | PT. Sinarmas Agro Resources Technology -Tbk Padang Halaban - Labuhan Batu 2016 | Install Panel MCC BWTP Install Factory lighting Install Rack Kabel Install Cable Power Instal Cabel Electro Motor Testing & Commisioning |
74 | Supply & Install Panel Conveyor PT. Sari Dumai Sejati | PT. Sari Dumai Sejati Dumai 2016 | Supply & Installation Install Cable Power Install Earthing System Testing & Commisioning |
75 | Supply Panel Starter Sterilizer PT. Prima Palm Latex Industri | PT. Prima Palm Latex Industri Medan 2016 | Supply Panel Starter Sterilizer Install Factory lighting Install Cable Power Genset, Install Cablel Turbine Install earthing sistem Cable E. Motor Wiring |
76 | Supply Panel MSB PT. Era Saktiwira forestama | PT. Era Saktiwira forestama Jambi 2016 | MSB, MCC, Lighting Testing & Commisioning |
77 | Supply Panel Screw Press PT. Jayatech Palmindo | PT. Jayatech Palmindo Medan 2016 | Supply Panel Screw Press Install Factory lighting Install Cable Power Genset, Install Cablel Turbine Install earthing sistem Cable E. Motor Wiring |
78 | Supply Electrical Panel Palm Oil Mill Cap 60 Tons Tbs/Jam PT. Risman Scham Palm Indonesia | PT. Risman Scham Palm Indonesia Pekanbaru 2017 | Install Panel Synchrone Turbine, Genset Install Factory lighting Install Compound Lighting Install Cable Power Genset Install Cablel Turbine Cable E. Motor Testing & Commisioning |
79 | Supply & Install Electrical Panel
Kernel Crushing Plant (KCP) PT. Sari Dumai Sejati | PT. Sari Dumai Sejati Dumai 2017 | Supply &Install MSB Panel Install Factory lighting Install Cable Power Genset, Install Cablel Turbine Install earthing sistem Cable E. Motor Wiring |
80 | Supply & Installation Turbine 1000 kW PT. Candi Artha | PT. Candi Artha Kalimantan Selatan - Banjarmasin 2017 | Supply & Install Turbine 1000 kW Testing & Commisioning |
81 | Supply & Installation Electrical Palm Oil Mill Cap 30 Tons/Jam PT. Sasmita Bumi wijaya | PT. Sasmita Bumi wijaya Kalimantan Barat 2017 | Install Panel Synchrone Turbine, Genset Install Panel MCC Install Factory lighting Install Compound Lighting Install Cable Power Genset Install Cablel Turbine Cable E. Motor Testing & Commisioning |
82 | Supply & Installation Elecrtrical Palm Oil Mill Cap 45 -60 Tons/Jam PT. Samboja Inti Perkasa | PT. Samboja Inti Perkasa Kalimantan Barat 2017 | Install Panel Synchrone Turbine, Genset Install Panel MCC Install Factory lighting Install Compound Lighting Install Cable Power Genset Install Cablel Turbine Cable E. Motor Testing & Commisioning |
83 | Supply Panel Turbine 1200 kW PT. Pratama Unggul Sejahtera | PT. Pratama Unggul Sejahtera Belitung - Kep. Bangka Belitung 2017 | Supply & Install ACB 3200A Install Cablel Turbine Install earthing sistem Wiring & Modification Synchrone Install Busbar Test Commisioning |
84 | Supply Panel Turbine 1800 kW CV. Mutiara Alam Lestari | CV. Mutiara Alam Lestari Bangka Belitung 2017 | Supply & Install ACB 3200A, Install Cablel Turbine Install earthing sistem Wiring & Modification Synchrone Install Busbar Test Commisioning |
85 | Supply dan Installasi Kabel Jumper Gas Engine PT. Dasa Anugrah Sejati | PT. Dasa Anugrah Sejati Jambi 2017 | Install kabel turbine dan elektro motor Install kabel Tray Testing & Commisioning |
86 | Supply dan Installasi Kabel Jumper Gas Engine PT. Inti Indosawit Subur | PT. Inti Indosawit Subur Jambi 2017 | Install kabel turbine dan elektro motor Install kabel Tray Testing & Commisioning |
87 | Supply dan Installasi Kabel Jumper Gas Engine PT. Hari Sawit Jaya | PT. Hari Sawit Jaya Aek Nabara 2017 | Install kabel turbine dan elektro motor Install kabel Tray Testing & Commisioning |
88 | Supply dan Installasi Kabel Jumper Gas Engine PT. Saudara Sejati Luhur | PT. Saudara Sejati Luhur Kisaran 2017 | Install kabel turbine dan elektro motor Install kabel Tray Testing & Commisioning |
89 | Installation Kernel Plant KCP | PT. Surya Pratama Kreasindo Jambi 2017 | Install Panel MCC KCP Install Factory lighting Install Rack Kabel Install Cable Power Instal Cabel Electro Motor Testing & Commisioning |
90 | Supply & Installation Panel Palm Oil Mill 30 Tons/Jam PT. Pulo Padang Sawit Permai | PT. Pulo Padang Sawit Permai Rantau Prapat 2017 | Install Panel Synchrone Turbine, Genset Install Panel MCC Install Factory lighting Install Compound Lighting Install Cable Power Genset Install Cablel Turbine Cable E. Motor Testing & Commisioning |
91 | Supply Panel Electrical PT. Pembangunan Perumahan ( Persero ) Tbk | PT. Pembangunan Perumahan ( Persero ) Tbk Medan 2017 | Supply Panel Elektrical Testing & Commisioning |
92 | Supply Panel Pressing PT. Sasmita Bumi Wijaya | PT. Sasmita Bumi Wijaya Kalimantan Barat 2017 | Supply Panel Pressing Testing & Commisioning |
93 | Supply & Installation Panel Genset & Biogas PT. Surya Pratama Kreasindo | PT. Surya Pratama Kreasindo Jambi 2017 | Install Panel MSB Install Factory lighting Install Compound Lighting Install Cable Power From MSB Instal Earting System Testing & Commisioning |
94 | Panel Turbine 1700 kW PT. Wana Potensi Guna | PT. Wana Potensi Guna Palembang 2017 | Supply & Install ACB 3200A, Install Cablel Turbine Install earthing sistem Wiring & Modification Synchrone Install Busbar Test Commisioning |
95 | Supply Panel AMF/ATS PT. Propadu Konair Tarahubun - Pabrik Pupuk | PT. Propadu Konair Tarahubun Medan 2018 | Supply & Install AMF Panel Commisioning Test |
96 | Supply & Installation Kernel Plant KCP PT. Citrakoprasindo Tani | PT. Citrakoprasindo Tani Jambi 2018 | Install Panel MCC KCP Install Factory lighting Install Rack Kabel Install Cable Power Instal Cabel Electro Motor Testing & Commisioning |
97 | Supply Panel Capasitor Bank PT. Wana Potensi Guna | PT. Wana Potensi Guna Palembang 2018 | Supply & Install Panel Commisioning Test |
98 | Kalibrasi Protection Relay PT. Menggala Sawitindo | PT. Menggala Sawitindo Jambi 2018 | Pengecekan Kalibrasi Panel Commisioning |
99 | Supply & Installation Panel Boiler CV. Mutiara Alam Lestari | CV. Mutiara Alam Lestari Bangka Belitung 2018 | Install Panel Boiler Install Factory lighting Install Compound Lighting Install Cable Power From Boiler Instal Earting System Testing & Commisioning |
100 | Supply & Installation Panel MCC Threshing PT. Banyu Bening Utama | PT. Banyu Bening Utama Pekanbaru 2018 | Install Panel MCC Threshing Commisioning Test |
101 | Supply Panel Cubicle PT. Surya Pratama Kreasindo | PT. Surya Pratama Kreasindo Medan 2018 | Supply Panel Cubicle Test Commisioning |
102 | Supply & Installation Electrical Palm Oil Mill Cap 60 Tons/Jam PT. Kurnia Batang Hari Berjaya | PT. Kurnia Batang Hari Berjaya Jambi 2018 | Install Panel Synchrone Turbine, Genset Install Panel MCC Install Factory lighting Install Compound Lighting Install Cable Power Genset Install Cablel Turbine Cable E. Motor Testing & Commisioning |
103 | Supply & Installation Panel Power Plant PT. Citra Koprasindo Tani | PT. Citra Koprasindo Tani Jambi 2018 | Supply Panel Power Plant Install Factory lighting Supply & Install ACB 6300A, Install Cablel Turbine Install earthing sistem Wiring & Modification Synchrone Install Busbar Test Commisioning |
104 | Supply Pintu Panel Shaft PT. Mahardika Agung Lestari | PT. Mahardika Agung Lestari Medan 2018 | Supply Pintu Panel Shaft |
105 | Supply Panel Turbine 1280 Kw PT. Wana Jingga Timur | PT. Wana Jingga Timur Pekanbaru 2018 | Supply & Install ACB Install Cable Turbine Install earthing system Wiring & Modification Synchrone Install Busbar Test Commisioning |
106 | Supply Panel AMF/ ATS CV. Tri Karya Sentosa | CV. Tri Karya Sentosa Medan 2018 | Supply & Install AMF Panel Commisioning Test |
107 | Supply & Instalasi Panel Inverter PT. Mahkota Artha Indoesia | PT. Mahkota Artha Indoesia Medan 2018 | Supply & Install Panel Inverter Commisioning Test |
108 | Supply & Instalasi Panel Pressing Line - 1 CV. Sungai Bahar Pasific Utama | CV. Sungai Bahar Pasific Utama Jambi 2018 | Supply & Install Panel Pressing Commisioning Test |
109 | Supply Panel Genset 500 kVA PT. Candi Artha | PT. Candi Artha Kalimantan Selatan - Banjarmasin 2018 | Supply Panel Genset Install Factory lighting Install Compound Lighting Install Cable Power Cable E. Motor Testing & Commisioning |
110 | Supply & Installation Panel KCP 200 TPD PT. Surya Pratama Kreasindo | PT. Surya Pratama Kreasindo Bagerpang - Sumatera Utara 2018 | Install Panel MCC KCP Install Factory lighting Install Rack Kabel Install Cable Power Instal Cabel Electro Motor Testing & Commisioning |
111 | Supply & Installation Electrical Palm Oil Mill 30 Tons Tbs/Jam PT. Surya Pratama Kreasindo | PT. Surya Pratama Kreasindo Kalimantan Timur 2018 | Install Panel Synchrone Turbine, Genset Install MCC Install Factory lighting Install Compound Lighting Install Cable Power Genset Install Cablel Turbine Cable E. Motor Testing & Commisioning |
112 | Supply & Installation Electrical PT. Bumi Khatulistiwa Mandiri | PT. Bumi Khatulistiwa Mandiri Palembang 2018 | Supply Panel Electrical Commisioning Test |
113 | Supply & Install Panel PLC PT. Sari Dumai Sejati | PT. Sari Dumai Sejati Dumai 2018 | Install Panell PLC Testing & Commisioning |
114 | Instalation BIO GAS PT. Asian Agri Group | PT. Asian Agri Group Gunung Melayu 2018 | Install Panel MSB Install Factory lighting Install Cable Power From MSB Instal Earting System Testing & Commisioning |
115 | Instalation BIO GAS PT. Asian Agri Group | PT. Asian Agri Group Negeri Lama 2018 | Install Panel MSB Install Factory lighting Install Cable Power From MSB Instal Earting System Testing & Commisioning |
116 | Instalation BIO GAS PT. Asian Agri Group | PT. Asian Agri Group Buatan Satu 2018 | Install Panel MSB Install Factory lighting Install Cable Power From MSB Instal Earting System Testing & Commisioning |
117 | Instalation System Gas Engine | PT. Asian Agri Group Gunung Melayu 2018 | Install Factory Lighting Install kabel turbine dan elektro motor Install kabel Tray Instal Earting System Cable E. Motor Testing & Commisioning |